Rayzor Ranch MOB – Denton, TX

Medical Office Building occupied by Cook's Children Hospital

What was it about?

Two-story Medical Office Building built 2018/2019 utilizing cold-formed steel prefabricated panels, Ecospan floor system, and K Joists for the roof.


What did I do?

This project as originally designed was over budget and we worked on reducing cost through value engineering. I was responsible for leading the design team, coordinating the 3D modeling, budgeting, shop drawings distribution, and on-site project management of the subcontractor installer.


What did I learn?

Working with Armstrong-Douglas we coordinated the loads for the building structure so that the foundation could be properly designed. Open communication with many different professionals is extremely important for a project that is having its original design changed.

DATE


March 18, 2019

CLIENT


XS Construction